Maths Olympiad Prep

Library / /145 of 520

Combinatorics Difficulty 3.0 Junior Find the answer

I'd like to brew a pot of tea. Washing the kettle, filling it with cold water takes 2 minutes, washing the teapot and cups takes 2 minutes, getting tea leaves takes 1 minute, boiling water takes 15 minutes, and brewing the tea takes 1 minute. The shortest operation time is ( ).

A: 17 minutes
B: 18 minutes
C: 19 minutes
D: 20 minutes

Multiple choice: answer with the letter of the option you want.

Solution

To minimize the total time, we can multitask during the water boiling process. Here's a step-by-step plan:

1. Wash the kettle and fill it with cold water, which takes 2 minutes (22 minutes).
2. While the water is boiling, which takes 1515 minutes, we can:
- Wash the teapot and cups (22 minutes)
- Get the tea leaves (11 minute)
- Given the boiling takes 1515 minutes, we can do these tasks simultaneously without needing extra time.
3. Brew the tea, which takes 1 minute after the water has boiled (11 minute).

Adding the durations of these steps, we have 2+15+1=182 + 15 + 1 = 18 minutes.

Consequently, the shortest operation time is 18 minutes\boxed{18\text{ minutes}}.

Want a route through all this instead of an archive? The track puts 2,000 problems in a working order, from AMC 10 level to the IMO shortlist.

Source: NuminaMath-1.5, licensed Apache-2.0. Statement and solution reproduced as published; topic and difficulty added by this site.