A straight concrete sidewalk is to be 33 feet wide, 6060 feet long, and 33 inches thick. How many cubic yards of concrete must a contractor order for the sidewalk if concrete must be ordered in a whole number of cubic yards?

Pick one

Solution

This is a 11 yard by 2020 yard by 1/121/12 yard sidewalk, so its volume in yards is
1×20×112=1.6.1\times 20\times \frac{1}{12} = 1.\overline{6}.
Since concrete must be ordered in a whole number of cubic yards, we need 2A2\rightarrow \boxed{\text{A}}.