In Mücheln (Geisel Valley, District of Halle), the longest railway bridge in the GDR was completed. It consists of 7 identical bridge arches.
For one bridge arch, 147m3 of concrete was used. 1m3 of concrete has a mass of 24dt. How many tons of concrete were needed for the bridge construction? (Round to the nearest whole ton!)
A number or a short expression. Fractions can be typed as 3/2, and spacing doesn't matter.
Official solution
7 (arches) ⋅147m3⋅24m3dt=24696dt. In total, approximately 2470 tons of concrete are required.
Source: NuminaMath-1.5,
licensed Apache-2.0.
Statement and solution reproduced as published; topic, difficulty and ordering added